• Shop
  • Marco Order
  • Services
  • Get a WebsiteStart Now

RECONSTRUCTION ELIMINATION OF THE CONSEQUENCES OF THE EARTHQUAKE IN ISHE NPV NO.2 | DURRES


The earthquake caused damage to the building. The degree of damage is not uniform, we have damage along the length of the two extremes of the building and height damage to the first floor, the second floor is moderately damaged and the ground floor is less damaged. The building was designed and organized for business.

Some of the works performed are:
- Reinforcement of columns and diaphragms
- Wall embedding in colna and brick wall construction
- Column reconstruction
- Stair construction and landing


See some photos during the works for the reconstruction of the buildings damaged by the earthquake:


termeti18.png?1663314381715  termeti19.png?1663314449295  termeti20.png?1663314472538 

termeti21.png?1663314490947  termeti22.png?1663314512318  termeti23.png?1663314530762 

termeti24.png?1663314552025  termeti25.png?1663314580411  termeti26.png?1663314600264 

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks