The earthquake caused damage to the building. The degree of damage is not uniform, we have damage along the length of the two extremes of the building and height damage to the first floor, the second floor is moderately damaged and the ground floor is less damaged. The building was designed and organized for business.
Some of the works performed are:
- Reinforcement of columns and diaphragms
- Wall embedding in colna and brick wall construction
- Column reconstruction
- Stair construction and landing
See some photos during the works for the reconstruction of the buildings damaged by the earthquake: