The Klara buildings were built in 2000, where the seismic performance is problematic. As a result, the intervention was made in the structure by expanding the plinths and skirting the columns up to the third floor, making all the interventions according to the proposal detailed in the project, for the rehabilitation of the structure. The C-FRP method is used, which serves to increase the bearing capacity of the element in the case of beams, this method means reinforcing the beams with carbon fibers.